open pit mine design factors

Evaluation of Open Pit Mine Slope Stability Analysis

economical mining operations The slope stability is governed by the local geological and geo-technical characteristics of the slope forming mass and the prevailing ground water conditions (Singh et al 1998; Singh et al 1999) The design of the open pit mine slopes is a deciding factor for.

More

Determining the open pit to underground transition: A new

Nilsson (1981) gave a good account of the factors that need to be considered when planning a transition from open pit to underground mining, including geotechnical interactions, economic considerations and operational challeng He recognised that the optimal pit design changes if.

More

Reconstructions

design should take into account the findings of rock fragment assessment to cut down the mining cost and shorten the working time Drilling and blasting in open pit mines represent 15 to 20 % of the total mining cost [13] For constant conditions of bench height, powder factor, type of rock, and blast hole.

More

Some Technical Aspects of Open Pit Mine Dewatering

Drainage Control for Surface Mines 22 Some Technical Aspects of Open Pit Mine Dewatering by V Straskraba, Senior Mining Hydrogeologist, Dames & Moore, Denver, Colorado, USA In recent years the increase in development of new open pit mines, especially in the Western US, is evident.

More

Guidelines for Open Pit Slope Design 3

The design of the slopes is one of the major challenges at every stage of planning and operation of an open pit mine It requires specialised knowledge of the geology, which is often complex in the vicinity of orebodies where structure and/or alteration may be key factors, and of the material properties, which are frequently highly variable.

More

Estimating Mining Factors (Dilution and Ore Loss) in Open

Large open pit mines are driven by the economies of scale that are achieved at the cost of less selectivity in the discrimination of ore and waste Planning for these mines is facilitated by the use of block models for mine design, scheduling and the conversion of Mineral Resources into Ore Reserv.

More

Investigation of Excavator Performance Factors in an Open

The data from such a dispatch system in Geita Gold Mine (GGM) was used in this study to assess the productivity of the open-pit mine Open-pit mine operation is an expensive business endeavor, with main cost components comprising of earth moving (or material transport) costs and heavy duty equipment investment, to mention a few.

More

MINE HAUL ROAD DESIGN AND MANAGEMENT BEST

condition or the role of road design in contributing to an accident (as a root-cause or associated factor) to be identified One of the first, and arguably most important initiatives to formalize the approach to design and management of mine haul roads was the USBM(3) Information Circular 8758

The design of the slopes is one of the major challenges at every stage of planning and operation of an open pit mine It requires specialised knowledge of the geology, which is often complex in the vicinity of orebodies where structure and/or alteration may be key factors, and of the material properties, which are frequently highly variable.

More

Chapter 8 BLAST DESIGN

Chapter 8 BLAST DESIGN (Figure 8-2) Staggered pattern (Figure 8-3) Sing , Calculating Powder Factors , The economic analysis of the use of explosives is an important part of blasting operations in mining and construction Explosives are energy, and the efficient use of this energy is a major factor in keeping rock blasting.

More

CONSIDERATIONS IN THE OPTIMISATION OF BENCH FACE

The South African Institute of Mining and Metallurgy International Symposium on Stability of Rock Slopes in Open Pit Mining and Civil Engineering Ian de Bruyn _____ Page 558 height, bench face angle and berm width can be used in the slope design All geometrical pit slope elements referred to here are illustrated in Figure 1 The.

More

(PDF) Optimum design of open pit mines

A fundamental problem in open pit mine planning is that of determining the optimum ultimate pit limits of the mine These limits are that pit contour which is the result of extracting a volume of.

More

Some Technical Aspects of Open Pit Mine Dewatering

Drainage Control for Surface Mines 22 Some Technical Aspects of Open Pit Mine Dewatering by V Straskraba, Senior Mining Hydrogeologist, Dames & Moore, Denver, Colorado, USA In recent years the increase in development of new open pit mines, especially in the Western US, is evident.

More

Guidelines for Open Pit Slope Design 3

The design of the slopes is one of the major challenges at every stage of planning and operation of an open pit mine It requires specialised knowledge of the geology, which is often complex in the vicinity of orebodies where structure and/or alteration may be key factors, and of the material properties, which are frequently highly variable.

More

I III'I,M

ADVANTAGES OF OPEN PIT MINING An open pit mine has several advantages over an underground mine The advantages most often recognized as major factors for selecting an open pit mining method over an underground mining method are economy, recovery of ore, grade control, flexibility of operation, safety, and working environment.

More

Waste Rock Dump Management and Stability Evaluation

diamond mine discussed in this paper is situated within the Maluti mountain range and is located at approximately 3100 m above sea level The mine is an open pit truck and shovel operation, and interest has been shown in the deposit since 1968 Mining commenced in 1972 and is still carried out to date.

More

Slope Design and Implementation in Open Pit Mines

and also limitations through case studies of slope design in open pit min Keywords: slope stability, slope design, engineering geology, fault, open pit mines, SOMAIR uranium mine, OCP phosphate mine 1 INTRODUCTION Slopes of mines and quarries, some of which may reach several hundred meters deep, must be.

More

(PDF) Optimized Open Pit Mine Design, Pushbacks and the

The ultimate pit is the maximum valued pit possible that obeys slope and physical constraints Pushbacks are produced from the sections of the ore body model that remain within the ultimate pit limits 508 OPTIMIZED OPEN PIT MINE DESIGN, PUSHBACKS AND THE GAP PROBLEM—A REVIEW 509 Fig 1.

More

Slope Design and Implementation in Open Pit Mines

This article reminds the principles of slope design in open pit mines, and presents techniques and tools available to address the successive stages of slope design Their practical implementation is then illustrated by two case studies of open pit min * Corresponding author Tel: +33 1-6469-4813; fax: +33 1-6469-4711.

More

Mathematical Optimization Models and Methods for Open

In this thesis, we study the open-pit design problem, the open-pit mining scheduling problem, and the open-pit design problem with geological and price uncertainty These problems give rise to (mixed) discrete optimization models that in real-life settings are large scale and computationally challenging.

More

The mine planning process for an open-pit diamond mining

mining cost depth escalation factor is currently US 16 cents per bench (bench height is 14 m) Processing costs The Letseng processing plants are also contractor-operated Treatment costs comprise the contractor labour rates, power, spares, and consumables per ton The mine planning process for an open-pit diamond mining operation.

More

Open Pit Mine Design

Itasca specializes in the assessment of slope stability and design of pit slopes on bench, inter-ramp, and global mine scal Itasca performs slope, instrumentation, and remediation design at many of the world’s largest open pit min Expertise in slope stability is not limited to open pit slop.

More

FINAL WALL STABILITY IN METAL OPEN PIT MINES USING

FINAL WALL STABILITY IN METAL OPEN PIT MINES USING PRESPLIT BLASTING ABSTRACT Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years Failure of.

More